JB Harlin Posted February 21, 2016 We have been working for the last few weekends installing a solid floor above the seat rails. We will be using the NVP to haul our equipment and need a relatively smooth, carpeted floor. We removed the factory carpet, added closed cell foam filler, then a layer of hardboard. Over the hardboard we added carpet pad and then a layer of carpet. With the tripod box installed, we are ready for the road. . . 2 wollip and Ben Murphy reacted to this Quote Share this post Link to post Share on other sites
wollip Posted February 21, 2016 Well done - extremely well done! Quote Share this post Link to post Share on other sites
andy_george Posted February 21, 2016 Really nice, looks factory! Quote Share this post Link to post Share on other sites
ASD Dad Posted February 21, 2016 Wow, that looks fantastic! Really nice work. Quote Share this post Link to post Share on other sites
axulsuv Posted February 21, 2016 Really clean job Quote Share this post Link to post Share on other sites
JB Harlin Posted February 21, 2016 Thanks everyone. We just wanted a nice smooth floor. Everything we did is easily removed if we ever want to rerun to the original factory configuration and the seats. Here are a few more snapshots. . . Here is the fitting of the hardboard Carpet pad installed My wife cutting the new carpet 3 Jeffrhobodine, Ben Murphy and wollip reacted to this Quote Share this post Link to post Share on other sites
Stavros Christopoulos Posted March 28, 2016 Very nice Quote Share this post Link to post Share on other sites
Ben Murphy Posted April 21, 2021 Did the registers require longer screws? Or did you reinstall them at the same elevation with the new floor rising around them? Quote Share this post Link to post Share on other sites